The Lignite gas plant is a gas processing plant located in Burke County, North Dakota, 10 miles (16 km) directly south of the North Portal border crossing. Lignite has a variety of processing services including sweet gas, a lean oil absorption process for superior NGL recoveries, the ability to fractionate recovered NGLs as well as trucked-in Y-grade, and production of C3 and C4. After processing, the product egresses through the WBI System while the NGLs are trucked out. The Company owns a 100% interest in Lignite and also owns an extensive 232 mile (373 km) gas gathering system of pipelines connected to Lignite and Steel Reef’s Canadian gas gathering infrastructure.
Facility Specifications:
Capacity – 10 MMcf/d
Frac Plant Capacity - 2300 bbl/day
Maximum Inlet H2S - 3%
Ownership Interests:
Steel Reef Infrastructure Corp – 100%
Product Deliveries:
Sales Gas – WBI Energy Transmission
C3, C4, Natural Gasoline – Trucked Out
Product Recoveries:
C3 - 79%
C4 - 98%
Natural Gasoline - 99+%
Associated Pipelines:
232 miles